Aim

Our aim is to help fund the Campaign against Chapelcross hyperscale AI data centre. The largest in the world!


We are a small but growing campaign group who stand in opposition to the (world's biggest!) planned hyperscale AI data centre (DC) on the grounds North of the former nuclear power station at Chapelcross, Annan.

CX Tech LTD are in the planning stages of building the world's largest hyperscale AI DC (1,000MW) in the rural area of Annan, South West Scotland. We are spreading the facts on this development and combatting the greenwashed narrative and the inflated economic benefit claims put forward by the developer.

We need funds to enable us to spread the word by booking halls for community engagement meetings, printing out leaflets and flyers, getting professional banners made, and potentially funding specialists to challenge the decision in court if the data centre is approved.

We have seen the negative impacts of hyperscale data centres (DCs) around the world and the overwhelming number of these developments in Scotland. We know that the people’s hearts are not in the minds of these developers. This DC will cover 52 hectares of naturally rewilded habitat and farmland, and will be on the doorstep of Creca village. A massive 162,000m2 of floor space will be taken up by the development; including 8 data centre buildings that will be 40m tall. These 8 data centre buildings will require over 300 biodiesel or diesel run generators.

The data centre would exceed the legal limit for greenhouse gas emissions in Dumfries and Galloway by almost double when fully operational and place massive strain on the energy grid; this would likely lead to increased costs in household electricity bills, as has happened in the US and Ireland.

We are the concerned standing for the concerned.

Why are we concerned?

  • This 1,000MW data centre would use as much power per year as over 2 million households, almost as many households as are in Scotland.
  • ‍‍‍‍Hyperscale DCs are LOUD. Worse still, the frequency of their noise emissions can travel for miles, disturbing our sleep and putting our bodies into “fight or flight” mode. This vibration

    is also known to have detrimental effects on local livestock and wildlife.

  • The cooling system which will be used, though left vague, has been described as “closed-loop”. Closed-loop systems often use “forever chemicals” (PFAS) for cooling, whichcan have negative impacts on the health of local people and animals, and on the water and soil surrounding the DC.
  • For more information on why we oppose this development (and sources for claims), see the slide deck in the featured section of the Facebook group.

But what about jobs? Our local area is crying out for jobs!

👀 Evidence from operational DCs has shown that job numbers, whilst good on paper, turnout to be inflated. On average, hyperscale DCs employ about 20-50 people.

☢️ Chapelcross Power Station employed hundreds of locals over decades of operations (and still employs now with decommissioning). Evidence shows that a DC would not provide the same employment opportunities.

Thank you for your support in protecting our local communities against this horrific data centre development.