Aim: Aim of Our Project The aim of our project is to establish a fully operational, small-scale gold mining operation in Zimbabwe that is legal,
Campaign Story
Our Mission
We are a small but legally registered mining team in Zimbabwe with the dream and drive to build a fully operational and ethical gold mine. After years of groundwork, compliance, prospecting, and site setup, we are ready to begin—but we lack the key equipment needed to operate at full capacity.
We invite you to partner with us in launching a small-scale, community-driven gold mine that will create jobs, sustain families, and uplift our region.
Why We Need Your Help
The land is ready. The gold is there. The licenses are secured. What we lack is the machinery to extract and process the gold efficiently and safely.
Funding will be used to acquire the following:
Excavation Equipment:
Used Compressor – $3,000–$5,000
Two Jackhammers – $1,200–$2,200
Diesel-powered Winch/Hoist – $3,000–$4,500
Overhead pulley and bucket systems – $800–$1,200
Ore Transport:
Underground Trolleys or small rail setup – $1,000–$2,000
Surface Tipper Truck or Utility Vehicle – $4,000–$7,000
Gold Processing (Concentration):
Sluice Boxes with Matting – $1,500–$2,000
(Optional) Shaking Table for fine gold recovery – $3,500
Water Supply System:
Water Pump (diesel or electric) – $1,000–$1,500
Pipes and Fittings – $500–$1,000
Water Tanks/Reservoir – $1,500
Basic Infrastructure:
Diesel Fuel Tank – $800
Worker Toilets & Safety Gear – $600
Initial Fuel Stock – $2,000
Contingency & Working Capital – $2,000
Our Strengths
Licensed, compliant, and legally approved.
Have basic tools and prospecting gear in place.
Registered with Fidelity Printers and Refiners (FPR) – guaranteeing market access.
Site has proven gold presence through prospecting.
How You Can Help
Donate any amount – Every dollar brings us closer to launching.
Share this campaign with friends, business leaders, and mining enthusiasts.
Partner with us – We welcome mining investors, suppliers, and joint ventures.
Use of Funds Breakdown
ItemEstimated Cost (USD)
Compressor + Jackhammers$6,000Winch/Hoist & Overhead Gear$4,500Ore Transport (Tipper + Trolleys)$8,000Gold Processing Equipment$3,500–$5,000Water System$3,000Infrastructure & Sanitation$1,400Fuel & Initial Capital$3,000Contingency$2,000Total Needed$30,000–$35,000Funding method
Keep what you raise – this project will receive all pledges made by 20th July 2025 at 2:21pm